NASSAU, BAHAMAS – If you’ve driven on Village Road lately, you would’ve seen lots of changes.
While construction is still on going, the ride is a lot smoother thanks to the Village Road Improvement Project.
According to Resident Engineer Albrion Symonette Jr., there is only 20 percent left of paving to be completed.
He says the goal is to leave the road in a much better condition than it was in before.
Symonette says the positive feedback from the public, makes him proud.
